Change order price worksheet

Contractors

Record a proposed change, the existing contract value, added cost with markup and agreed credit. Review the scope and price with both parties. A worksheet does not authorize work or change a contract.

Use one currency and matching units. Example rows are fictional, not recommended rates or procedures. Results display up to six decimal places. CSV previews show 100 rows; downloads include all rows, up to 10,000. Downloads prefix possible spreadsheet formulas with an apostrophe. Drafts preserve your inputs. Browser storage can be cleared; keep exported drafts as your backup.

Import is kept in this page's memory. The original profile file is unchanged.

Preview / results

Enter your details on the left to prepare your result.